HDC Local Plan and CCC A141 & St Ives Improvement Scheme: Engagement 2024
Revised 13th November 2024 with site references and addresses for both written and email responses.
What are the Local Plan and A141 Improvement Schemes and why is it important that residents of Broughton respond?
Huntingdonshire District Council (HDC) is consulting on its 2024 update to the Local Plan, and is seeking public views by Wednesday 27 November 2024. The Plan proposes a number of sites for development, both within Broughton and for major sites between the village and Huntingdon.
At this same time, Cambridgeshire County Council (CCC) is consulting on the proposed A141 and St Ives Improvement Scheme which is a separate consultation that could affect Broughton. This consultation also closes on Wednesday 27 November 2024.
Each site or scheme on its own could impact Broughton. Together, the Local Plan and Road Improvement Schemes could result in even more severe impacts for Broughton since they are not aligned.
Broughton Parish Council (BPC) want to ensure that Broughton’s residents know about both proposed developments and that you can respond. It is important that you express your views by 27 November so that HDC and CCC are aware of the huge and detrimental impact these plans could have on our village, including to flood risk and traffic.
What are the aspects of the Local Plan and Road Scheme that could most impact Broughton?
Follow the link to the interactive map of Local Plan sites here. The following could most impact Broughton (the links take you direct to the detailed documents):
- Land off Causeway Road (Broughton 1, North east Huntingdonshire)
- Site reference: CfS 153
- Proposed for 9 homes
- Hungary Hall, West of A141 (Wyton on the Hill 2, Eastern Huntingdonshire)
- Site reference: CfS 47
- Proposed for 4,500 homes plus schools, employment etc
- Lodge Farm, North of A141 (Wyton on the Hill 3, Eastern Huntingdonshire)
- Site reference: CfS 256
- Proposed for 5,000 homes plus schools, employment etc
- Sapley Park Garden Village (Abbots Ripton 6, Northern Central Huntingdonshire)
- Site reference: CfS 197
- Proposed for 9,000 homes plus employment, community centre etc
The road improvement scheme proposes a new road from Wyton roundabout to Spittals roundabout to take traffic around the north of Huntingdon (see map). However, there is no suggested improvement for traffic on the existing A141 from the north. Broughton could see increased traffic cutting through the village towards Kings Ripton and, if the Hungary Hall site is developed, could see traffic from some of the 4,500 homes coming through the village.
Suggested themes to use in your responses to the consultations
Impacts on traffic and flooding in Broughton could be severe. The following outlines these and other concerns which you may want to emphasise to HDC and CCC. These are only a guide and we encourage you to respond in your own words, using facts and evidence of existing issues wherever possible:
- Impact on flood risk: even if developers provide the required on site flood storage, urbanising such huge areas of greenfield land will exacerbate the existing flooding already experienced in Broughton, Wistow, Ramsey and along the relatively flat Bury Brook.
At least 16 Broughton properties were flooded in Dec 2020 and Causeway and Bridge Roads frequently flood to the level that the police have to close them and cars are abandoned. The Environment Agency (EA) and CCC support the village via our flood group because they recognise the risk.
The Bury Brook at Broughton is only ~15m above sea level and our catchment is pumped via Europe’s largest pump station at St Germans. With sea level predicted to rise by ~1m by 2100, significant investment in pumping and flood management is required to keep our heavily managed catchment dry even without further development adding to this pressure.
Even if not all the sites are pursued, the cumulative impact of two or more of the proposed major sites (Hungary Hall, Lodge Farm and Sapley Park Garden Village) on the Bury Brook, in addition to climate change, could have a significant impact on our future flood risk which the EA and CCC are working to reduce.
- Impact on traffic: increased congestion on our narrow lanes, some of which are liable to flooding, worsening safety hazards for pedestrians and cyclists.
- Impact on the environment: destruction of farmland and habitats, the loss of green and open spaces, and the disruption of wildlife
Central Government are spending £millions on environmental plans to encourage protection and enhancement of nature and the landscape, including through Sustainable Farming Initiative, Countryside Stewardship and rewilding projects. HDC is planning to “concrete over” thousands of acres of green space when there are many less environmentally valuable brownfield sites that should be considered. Destroying thousands of acres of prime wheat growing land also further risks the future of UK food security.
- Impact on noise levels and pollution: impact the quality of life for residents during construction and forever after, hugely increased urban activity and traffic
- Impact on the character and appearance of the area: such major development is wholly out of proportion to our conservation village, its historical significance, and the overall character of the surroundings which threatens the heritage value of the area
- Impact on neighbouring properties and privacy: development within and in the close vicinity of Broughton may overshadow or overlook existing properties, obstruct views, and infringe upon the privacy of residents.
- Impact on local amenities and services: increased strain on infrastructure, such as schools, healthcare facilities, or public services which are already hugely stretched
How can I respond to the consultations?
Responses to the Local Plan Consultation can be made by:
- Email to plan@huntingdonshire.gov.uk
- Letter to Huntingdon District Council, Pathfinder House, St Mary’s Street, Huntingdon PE29 3TN. Put Local Plan Consultation Response on the envelope
- The HDC Consultation Portal. You need to register to record your responses, and you should register as a ‘consultee’ to express your own views.
If providing responses by email or post, put the site reference number and address for each site (see above) in your text so HDC know which site(s) you are responding to.
You should comment on one or more of the following:
- Land availability assessment: Lists the sites proposed for development and provides information on what is proposed. You should add comments here that refer to the sites listed above. You can upload documents that include detailed responses, photos etc.
- Further Issues and Options Paper: Covers specific topics including climate change, flooding and water, transport, local employment and economy. You should add comments here that are relevant to specific topics.
- Sustainability Appraisal: HDC’s assessment of each site against a number of sustainability objectives. You should add comments here if you would judge the sustainability of the proposed sites differently. You can upload documents that include detailed responses, photos etc.
Responses to the A141 and St Ives Improvement Scheme consultation can be made by taking the survey on the Consultation Portal, by Emailing TalkA141@cambridgeshire.gov.uk or by writing to ALC2604, New Shire Hall, Emery Crescent, Enterprise Campus, Alconbury Weald, Huntingdon, PE28 4YE.
These are separate consultations, being run by separate councils and you will need to respond separately to each by the same deadline of Wednesday 27th November if you wish to express your views.